Sunday, September 16, 2007

[Robodock] Assembling Machines and Prop Building

So ends the 2nd week for the crew out in Amsterdam. It was spent mostly unloading the container which arrived late, re-assembling the machines that were packed in pieces and building new props for the show. The 3rd week starts with the arrival of the last batch of crew and machine testing and tweaking before the big show on Saturday!

Joanne, Kent, and Greg put the Inchworm together:



Images from Nina Alter

Kent, Mike, and Ulrika re-attach the Satan head to the Bombloader while Liisa forklifts it in. The face portion alone is a 300lb block of solid steel and the furnace and casing around it make it considerably more:



Images from Nina Alter

SRL @ Robodock

Links to this post:

Create a Link

<< Home